← NRC enforcement actions

NRC CAL – NOVCP (SL III) $ 3,500

EA-16-075 · CAL · Severity SLIII · Issued 2016-07-12 · Materials Licensees

Action

EA Number
EA-16-075
Licensee
NOVCP (SL III) $ 3,500
Category
Materials Licensees
Action type
CAL
Severity level
SLIII
Date issued
2016-07-12

Description

On July 12, 2016, the NRC issued a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $3,500 to Patriot Engineering and Environmental, Inc., for a Severity Level III violation of 10 CFR 20.1802 and 10 CFR 30.34(i). The violation involved the failure to secure licensed material from unauthorized removal or access, with a minimum of two independent physical controls that form tangible barriers, while the portable gauge was not in storage and not under the control and constant surveillance of the licensee. Specifically, an authorized user left a gauge unattended and unsecured, and the gauge was run over.

Source

Full letter
PDF on NRC ADAMS
NRC index
Materials Licensees enforcement actions
Machine
JSON-LD · Markdown